- Code conformance, Health, Safety, and Security improvements
- Repairs, Maintenance, and updates to Facilities and Systems
- Site improvements to address additional parking, separation of students, buses and passenger car circulation
- Addition to NTMS of ten additional instructional classrooms
The Capital Facilities Plan has identified approximately $62 million in improvements which will be needed for the District's facilities. Since the Scope of Work is substantial and the costs significant it was necessary to consider dealing with this issue in phases. In an effort to address this need in a fiscally responsible manner, it was recommended by the Capital Project Committee (consisting of school and community representatives) to proceed with the first phase by doing as much work as possible with a ZERO dollar tax impact. It was determined by the District's fiscal advisors, Capital Markets Advisor, LLC, that the District could do a $48 Million Capital Project at NO COST to the taxpayers. Therefore, Phase I of a multi-year plan proposes a capital project totaling $48 million in upgrades to the instructional buildings. Phase 2 will address work that has been deferred.
The proposed work in Phase 1 includes:
- HVAC Upgrades: replacement of various HVAC equipment including air handling/ventilation units, select boilers, and digital control systems, to provide proper levels of heating and ventilation and improve energy efficiency.
- Lighting and Electrical Upgrades: renovations to electrical services to buildings; replacement of select lighting and sensors to improve energy efficiency
- Plumbing System Upgrades: repair or replacement or pumps, piping, and fixtures in most buildings.
- Site Safety Improvements: repairs and/or replacements to existing paving, curbs and sidewalks at most of the District's buildings; enhanced or expanded paving to allow for better separation of bus/vehicle/pedestrian traffic
- Improved Security: better control of access to buildings with dedicated intercom and surveillance camera systems
- Emergency System Upgrades: replacement of five emergency generators; repair or replacement of various emergency and exit lighting systems
- Interior Finish Upgrades: replacement of floors, ceilings, and wall finishes in most instructional facilities
- Addition to NTMS: construct a ten-classroom addition to NTMS which can be paid for by Orleans-Niagara BOCES under a lease agreement and used for special needs students.
- Improved Accessibility: renovations to all facilities to provide better access to buildings, accessible toilet facilities, assisted listening systems, and addition of one elevator
- Exterior Repairs:masonry repairs; window repairs and replacements; repair or replacement of six roofs
- Expanding Technology:providing access to the latest in computer technology for staff and students, including expanded power and data infrastructure, ceiling-mounted projectors and interactive whiteboards in all classrooms
- Various other improvements:necessary due to the age and condition of the buildings
The proposed work involves the replacement of asphalt pavement, curbing, and sidewalks, repairs to foundations, exterior walls, and doors, replacement of windows and roof, replacement of floor finishes, ceilings, interior walls, and interior doors, replacement of lights, miscellaneous water piping, sump pumps, boilers, and hot water piping, improvements to the HVAC system, the addition of emergency lighting and technology improvements.
The proposed work involves the construction of an addition to be used as classrooms, the replacement of asphalt pavement and concrete sidewalks, repairs to foundation cracks, exterior walls, and interior walls, replacement of doors, windows, roof drains, floor finishes, ceilings, lockers, lighting, sump pumps, water heaters, plumbing fixtures, hot water pumps and emergency lighting, improvements to the HVAC system, and technology improvements.
The proposed work involves the replacement of structural floors, roofs, floor finishes, toilet room ceilings, door hardware, lighting, miscellaneous water pipes, water heaters; sump pumps, plumbing fixtures, and the addition of emergency lighting and technology improvements.
The proposed work involves the replacement of damaged sidewalks, repairs to walls, windows and foundations, replacement of interior walls, floor finishes, ceilings, and door hardware, replacement of lighting, miscellaneous water piping, sump pumps, miscellaneous toilet piping, hot water boiler, plumbing fixtures, and boiler pumps, improvements to the HVAC system, the addition of emergency lighting and technology improvements.
The proposed work involves the replacement of damaged sidewalks, sump pump and select plumbing fixtures, and emergency lighting and an allowance for technology upgrades.
The proposed work involves the replacement of asphalt paving, curbing and sidewalks, the replacement of doors, windows, ceilings and roof, repairs to walls, floors and foundations, replacement of lighting, sanitary and vent piping, water heaters, plumbing fixtures, electrical service switchboard and emergency wiring, improvements to the HVAC system, installation of elevator and the addition of technology improvements.
The proposed work involves the replacement of parking lot and exterior building lighting, replacement of curbing, damaged sidewalks and exterior steps, replacement of doors and door hardware, replacement of interior corridor and office ceilings, replacement of lighting, replacement of water piping, sewage ejector and sump pumps, water heaters, fixtures, faucets and traps, boilers and emergency generator, the addition of an assisted listening system, and the addition of technology improvements.
The proposed work involves the replacement of damaged sidewalks, patching the existing EPDM roof, repairing water leaks in the boiler room, replacing sump pumps, replacing emergency lights and adding emergency eyewash in the boiler room.
Detailed list of proposed work by buildings:
Middle School
Ohio Elementary School
Meadow Elementary School
Gilmore Elementary School
Spruce Elementary School
Drake Elementary School
Grant Elementary School
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer and Business classrooms
- Replace/reconfigure paving, walks and curbs
- Modify site lighting and controls
- Window system including blinds
- Roof at West Wing
- Finish flooring
- Select ceilings
- Select doors and hardware
- Boiler room electrical panels
- Select lighting and controls
- Exterior speakers
- Misc. plumbing piping, pumps and fixtures
- HVAC Equipment including Unit Vents, Air Handling Units, PTAC Units
- HVAC System controls with digital controls
- Boilers and breeching
- Emergency Generator and select emergency lighting
- Damaged interior walls
- Exterior masonry, concrete panels, and foundations
- Add assisted listening system
- Add curb ramps for exterior accessible routes

Temporary fix for damaged brick

Water damaged ceiling tiles, an indication of possible infrastructure damage and/or roof leaks
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer Room and Library
- Replace/reconfigure paving, walks and curbs
- Modify site lighting and controls
- Window system including blinds
- Corridor and athletic lockers
- Finish flooring
- Select ceilings
- Select doors and hardware
- Electrical service switchboard
- Select lighting and controls
- Sump pumps, water heaters, mixing valves and plumbing fixtures
- HVAC Equipment including Unit Vents, Air Handling Units, PTAC units
- Fin tube radiators and cabinet unit heaters; misc. ducts
- HVAC System controls with digital controls
- HVAC hot water pumps
- Emergency Generator and select emergency lighting
- Damaged interior walls
- Exterior masonry, concrete panels, and foundations
- Select areas of roof including drains
- Add assisted listening system
- Renovate toilet rooms for improved accessibility
- Add handicap lift for pool
- Gas shut-off valves
- Emergency phone in Elevator
- Water service backflow preventer
- Sprinklers at Stage

Cracked concrete foundation walls undermining masonry veneer

Piping leaks that are causing water damanged floors

- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer Room and Library
- Replace/reconfigure paving, walks and curbs
- Add parking lot lighting
- Playground curbing, structure and play surface
- Existing window-wall system
- Select interior partitions and toilet partitions
- Finish flooring
- Select ceilings
- Classroom door hardware
- Electrical service switchboard
- Select lighting and controls
- Sump pumps, summer boiler, mixing valves and plumbing fixtures
- HVAC Equipment including Unit Vents and Air Handling Units
- Fin tube radiators and cabinet unit heaters; misc. ducts
- HVAC System controls with digital controls
- HVAC hot water boiler pumps
- Emergency Generator
- Cracked and spalled foundation areas
- Exterior masonry walls and column bases
- Add assisted listening system
- Renovate toilet rooms for improved accessibility
- Speakers in Cafeteria
- Gym partition safety devices
- Emergency lighting at Gym

Typical uninsulated window-wall system to be replaced

Cracks in foundation that will eventually undermine the column
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer room, Library, LAN room and Offices
- Roof
- Finish flooring
- Damaged Toilet Room ceiling
- Door hardware
- Main Electrical service switchboard; Boiler room electrical panels
- P/A System
- Misc. plumbing piping, sump pumps and fixtures
- Plumbing pumps, mixing valves and water heaters
- HVAC Equipment including Unit Vents and Air Handling Units
- HVAC System controls with digital controls
- Fin tube radiators and cabinet unit heaters; misc. ducts
- Boiler breeching and pumps
- Remove existing Generator and replace distribution equipment
- Add select emergency lighting
- Cracked interior masonry walls
- Cracked and spalled foundation areas
- Exterior masonry
- Wheelchair lift at Gym stage
- Add assisted listening system
- Renovate Nurse's office toilet room for accessibility

Damaged sidewalks, concrete, and curbs in need of replacement

Masonry cracks with possible damaged lintels
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Replace/reconfigure paving and walks including storm drainage
- Transformer room door
- Sump pumps
- Select plumbing fixtures
- Non-functioning emergency lighting

Water damage in girls' locker room
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer Room, Library and LAN room
- Replace/reconfigure paving, walks and curbs
- Add parking lot lighting
- Playground curbing
- Gym windows
- Roof (except 1993 addition)
- Finish flooring
- Majority of ceilings
- Select doors and hardware
- Electrical service switchboard; boiler room panels
- Select lighting and controls
- Select sanitary and vent piping
- Water heaters, pumps, mixing valves and plumbing fixtures
- HVAC Equipment including Unit Vents and Air Handling Units
- Fin tube radiators and cabinet unit heaters
- Misc. ducts and steam piping
- HVAC System controls with digital controls
- Select emergency wiring
- Cracked and spalled foundation areas
- Boiler room slab
- Exterior masonry walls and column bases
- Interior damaged masonry and plaster partitions
- Add assisted listening system
- Renovate various toilet and locker rooms for improved accessibility
- Add new elevator in self-enclosed addition
- Speakers in Aud and Cafeteria
- Gym partition safety devices

Damaged door in need of replacement

Masonry cracks
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer Room, Library and Copy Room
- Replace/reconfigure paving, walks and curbs
- Replace site and exterior building lighting
- Playground curbing
- Storefront at vestibule
- Select roof drains
- Select interior partitions and toilet partitions
- Finish flooring
- Select ceilings
- Door hardware
- Electrical service switchboard
- Select lighting and controls
- P/A System
- Sump pumps, sewage ejector pump, water heaters, mixing valves
- Plumbing fixtures
- HVAC Equipment including Unit Vents and Air Handling Units
- Fin tube radiators and cabinet unit heaters; misc. ducts
- HVAC System controls with digital controls
- Boilers, feed system and pumps
- Emergency Generator
- Cracked foundation areas and areaway
- Exterior masonry walls
- Concrete steps at exits
- Add assisted listening system
- Renovate Nurse's office toilet room for improved accessibility
- Speakers in Cafeteria
- Gym partition safety devices
- Emergency lighting at Gym
- Exit lights at select rooms

Damaged concrete

Water leaks, an indication of possible infrastructure damage and/or roof leaks
- New wiring, video projectors and interactive whiteboards
- Security enhancements
- Playground curbing
- Terrazzo treads at rear entry stairs
- Sump pumps
- Select plumbing fixtures
- Non-functioning emergency lighting
- Clogged site storm drainage piping
- EPDM roof over original building
- Boiler room wall damage from water leaks

Badly damaged concrete in need of repair that is undermining the foundation of the landing